PM opens ‘Haor Road’ in Kishoreganj
Prime Minister Sheikh Hasina today formally opened the Itna-Mithamoin-Austagram all-weather road in Kishoreganj to traffic.
Sheikh Hasina inaugurated the 29.73km road through a video-conference from her official residence Gono Bhaban.
The road was constructed at a cost of Tk 874.08 crore, which connects three upazilas of Kishoreganj -- Itna, Mithamoin and Austagram.
The Itna-Mithamoin-Austagram road goes straight through a vast haor area in parallel with Dhanu and Baulai rivers starting from Itna to Austagram via Mithamoin upazila.
The road has already been turned as one of the most beautiful destinations for travelers and holidaymakers before its formal inauguration.
A huge number of tourists flock regularly to the road to enjoy its scenic beauty and its surrounding haor areas.
Almost half of Kishoreganj district, including four of its six upazilas -- Itna, Mithamoin, Austagram, and Nikli-- is designated as a haor area.
In 2016, President Abdul Hamid inaugurated the construction of the road in his native district.
The road will also be connected to Sylhet-Brahmanbaria road in the future and a plan has been taken to build a flyover on it.
The road, popularly known as the 'Haor Road', paved the way for direct road connectivity between the haor region and other parts of the country, including Dhaka, Sylhet and Chattogram.
On the occasion, the Prime Minister exchanged views with local people who were connected from Mithamoin upazila. Local MPs and dignitaries of Kishoreganj district were present at the Mithamoin end.
While exchanging views with local people, the PM said the road is a gift on behalf of President Abdul Hamid in Mujib Borsho (Mujib Year).
Road Transport and Bridges Minister Obaidul Quader delivered the welcome speech at the inaugural function conducted by PM's Principal Secretary Dr Ahmad Kaikaus.
Road Transport and Highway Division Secretary Md Nazrul Islam made an audio-visual presentation over the road project on the occasion.
The Roads and Highways Department implemented the road project that includes the 29.73km main highway, three PC girder bridges, 11 RCC girder bridges, 62 RCC box-culverts, road protection dam and land acquisition.
Comments